Please Click Below For Case Studies & Pictures

one

This bathroom required the walls to be re boarded ready to be re-tiled, pipework to be concealed, the floor to be over boarded prior to tiling and finally the installation of the finished bathroom products.

two

A small cloakroom originally with exposed pipework re-routed as to create a modern, clean more spacious look.

three

In this room we removed the customers’ existing bath and redesigned the room as to create space for a shower enclosure and incorporate a wall hung basin with vanity unit as to allow for extra storage.

four

This ensuite required the redesign of the original room layout and the removal of a wall as to create a modern usable layout without the need to have any box work.